Brazil France Germany India Indonesia Iraq South Africa
 
 
Sign up for our
free e-newsletter.





Case Studies
E-Newsletter
News
Resources
Water Management Associations
 
Columbia Irrigation District Hopes Aquatic Weed Cutter Cuts Their Problems
With this drought season being a rough one, the Columbia Irrigation District tried their best to do everything they could to make sure they can get all their customers the water they need. A lot of weeds are clogging up the Yakima River preventing it from flowing into a canal near the Wanawish Dam.

The warmer water temperatures made more weeds grow and the water levels this year are almost down two feet. Normally the district would spend more than $200,000 to use chemicals to clear the weeds in the canal, but they hope this new option is cheaper.

An aquatic weed harvester has been called in to cut and collect aquatic vegetation. The harvester opened channels creating more water flow. The harvester worked very well.

 
Click for the full article
 


About Us Categories From The Gallery   News Updates News Updates

Our Company
Case Studies
Products
Site Map

Resources/Tools
Parts/Service
International

Beneficial Reef Projects to the Outer Banks - Construction of a living shoreline reef is under way, to be followed in a few years by restoration of four existing reefs with demolished bridge material. And an entirely new reef is also being planned, thanks to a grant funded by fishing license fees


© 2010 Copyright Aquarius Systems. All Rights Reserved. info@aquarius-systems.com   |   (262) 392-2162