Brazil France Germany India Indonesia Iraq South Africa
 
 
Sign up for our
free e-newsletter.





Case Studies
E-Newsletter
News
Resources
Water Management Associations
 
Buffalo Lake Management Team
The Parlby Creek-Buffalo Lake Water Management Project is a five phase multiple use water management project in Central Alberta, designed and constructed for Water Resources Management Services, a division of Alberta Environment (the proponent).

The project was designed to provide agricultural flood control, fish and wildlife habitat enhancement, municipal water supplies and the stabilization of water levels in Buffalo Lake.

Learn more about the Project

 
 


About Us Categories From The Gallery   News Updates News Updates

Our Company
Case Studies
Products
Site Map

Resources/Tools
Parts/Service
International

Proposed Aquatic Invasive Species Program Creates Waves - The Minnehaha Creek Watershed District (MCWD) is considering a plan to require anyone wanting to put a watercraft, dock, boat ramp, or other equipment in a body of water within the district must demonstrate that it is free of AIS. In order to do that, a proposition has been made to require people to pay to have their equipment inspected and decontaminated if needed.


© 2010 Copyright Aquarius Systems. All Rights Reserved. info@aquarius-systems.com   |   (262) 392-2162